Route 109 Businesses – New Temporary Signs Allowed

The Town of Medway recognizes that businesses located along Route 109 are facing challenges dealing with the impacts of the Route 109 Reconstruction Project. Accordingly, the Town is allowing limited temporary business signs during the Route 109 construction season as specified in new rules announced on May 8th.The goal is to enable local businesses to install temporary signage to inform the travelling public of changes in their business operations. There are no application fees to apply for these temporary signs but a permit is required for installation.

Use links below for more informaiton about the Temporary Signs Allowance and the required Application.

Temporary Signs Route 109 Construction

Route 109 Temporary Signs Application

Posted in

View other posts